这是描述信息

News

You are here:
Homepage
/
/
/
EMO–preliminary report

EMO–preliminary report

  • Categories:News
  • Author:
  • Origin:
  • Time of issue:2020-06-17 14:44

EMO–preliminary report

(Summary description)

  • Categories:News
  • Author:
  • Origin:
  • Time of issue:2020-06-17 14:44
Information

Milano–the design city
Milano–venue of the EXPO  2015, the world exhibition
Milano–venue of EMO  2015, the biggest and most important tool and machine tool exhibiton of the world, the world of manufacturing

Is there a better place to introduce the new look of one of the leading PVD companies?

We don’t think so.

PVT has made excellent progress with the development of PDA* and HiParc** technologies in the past few years in

  • the quality of the functional tool coatings
  • the increase of the productivity of the coating systems
  • the reduction of coating process time
  • the better utilisation of targets

These technical improvements called for a new machine design that features these achievements: the combination of technical progress (interior) and new machine design (exterior) in the form of an angular ‚edge design‘ which demonstrates the vitality of the company, even after 30  years experience in  PVD technology.

While the technological development is an ongoing process the development of a new exterior had begun right after EMO 2013. When first drafts of the design agency “formsprache” in Darmstadt (www.formsprache-gestaltung.de) got positive feedbacks from our customers we decided to complete this project in time for EMO 2015 in Milano.

At the same time we not only completely reviewed the machine design, we also decided at an early stage to cooperate with “formsprache” to transfer the new design philosophy onto the logo, the web page and the exhibition booth design t to celebrate the 30 year anniversary of the company with the aim of giving PVT a completely new look.

The new design of the logo enhances and supports this transformation without leaving the roots of the company behind. A number of style and design elements were adopted and carefully modernized and interpreted. The new color concept- black/blue, blue/grey and yellow stands for the solid vitality of the company.

We are looking forward to seeing you at our booth in Milano, Hall 7, booth # F 20

PDA*       = Plasma Diffused Arc
HiParc**  = High power Pulsed arc

Trade Shows

News


  • Delivery and installation of complete turnkey-coating centers. Participation at more than 20 exhibitions and shows in different countries: IMTEX in India, EMO in Hannover and DMC in Shanghai, just to name only a few.
    Four events stand out and deserve a closer look:

    1.  xxl6.5 – The Heavyweight

    The biggest coating system ever built by PVT, has been in China now for 12 months and has been in operation ever since without any problems.

    Key data – for your information
    • total height of the machine: 4.200 mm
    • coating chamber for parts up to 3.000mm coating length
    • designed for substrates with up to 450 mm in diameter
    • designed for substrates with up to 3.000 kg weight

    Our client reports satisfaction with the system and due to the in-house coating facilities a significant increase in turnover and  a rise in market shares.
    PVT will support this business partner strongly in the future.

    2.  A new location – PVT Qingdao

    After PVT Germany took over 100% of the shares of PVT Shandong in Linyi the business was moved to Qingdao. New address is the ‚Sino-German-Eco-Park- Qindao (see photos) , a prospering Industry Park that includes many German businesses in the meantime.
    The ‚Sino-German-Eco-Park Qingdao‘ became known due to the commitment of the  German soccer club FC Bayern München to establish a soccer training school there. 
    The consulting board includes authority figures such as  Klaus Schlappner, a famous soccer dignitary  and well-known former coach of the Chinese national soccer team.

    Soon after PVT Qingdao began coating operations the machine park was expanded and now includes a very efficient plasma-nitriding system. The dual chamber system has vacuum chambers of 1.000 mm in diameter and an effective height of 1.700 mm.

    The PVD coating capacity will be increased by 200% at the beginning of next year, i.e. after the Chinese New Year Celebrations.

    3.  CLS Technology

    At the beginning of the year PVT got an order to develop a highly productive batch-coating system for the deposition of optically dense and highly reflecting metal coatings (CLS technology).

    The client will deposit these coatings on bulky pre-painted automotive components.
    The internal dimensions of the coating chamber amount to a diameter of 1.800 mm and a height of 1.200 mm. PVT successfully reduced the cycle times of 12 minutes requested by the customer ( including loading and unloading) minutes by 25 %.  Now, every 9 minutes coated substrates leave the coating chamber, much to the delight of the client.

    The coating system is currently on its way to China after a successful process simulation.

    4.  HiPIMS and Sputtering of diamond-like carbon coatings (DLC)

    Midyear PVT decided to develop the first own industrial HiPIMS/Magnetron  Sputtering system. The solid basis to that were the preceding very successful process validitations . 
    The introduction of this product will probably take place already in spring 2018.

    Thus PVT is worldwide the only company to use large rectangular sources for all its processes: arc evaporation, magnetron sputtering and HiPIMS. 
    The applications of these  are the areas where erosion- and corrosion resistant, wear resistant and tribological (low-friction) high-performance coatings are needed for cutting tools, dies and molds, components and wear parts.

    PVT will keep you posted.
    Please contact us if you have questions regarding our products and processes.

Copyright © PVT (Harbin) Coating Co.,Ltd       Powered by  www.300.cn Harbin          黑ICP备14000285号